BILLY R. TOWNSEND
Cell: (509) 263-8597 n Email:
bilbont@gmail.com
PROFILE
A reliable, observant and self-motivated Telecommunication
Construction Manager III with twenty-six years extensive background in
installation planning, management, supervision and site surveys. Has
demonstrated abilities as an innovative thinker and effective problem-solver
with excellent interpersonal, organizational and communications skills.
A sound decision-maker with experience in wireless, switch and transmission
systems, power plants, shunts, batteries and rectifiers, earthquake grids and
fiber optics, reengineering theory and applications. Adapts quickly to
daily challenges in a complex environment.
CERTIFICATIONS AND SKILLS
EricssonLTE Certified
EricssonRBS 2102,
2202, 2106, 2206, 3106, 3206, 3308, 6000, AXE 10, BYB 501, LMU, Site Surveys,
Ericsson Certified Level 3 Installer, CPR Certification
Northern
TelecomNT # A02810, OC-48, OC-12, OC-192, DMS-100
–
DMS-250, Access Node, FMT 150
AT&TOC-12, OC-3, Power Plants,
Rectifiers,Certified
AT&T
CingularE-911 – Edge
FujitsuFLM-2400, FLM-600, FLM-150
CiscoXDSL, Router
ReliancePower Plants
MarconiMCN 7000, Testing and install
Rox
TecTraining and Certification, 2006
MiscellaneousNIU shelf, NEC
RC 28 MUX, DSC-1, DSX-3, ADC LCC DSX-3, CO-LAN Bay, Collocates, Dantel
Alarms, Ring PLT Dist. IBM Telecom 960, PBX Small Business, Elcotel Pay Phone
PROFESSIONAL AWARDS
T-Mobile Achievement Award
Ericsson Quality Workmanship
Nortel Supplier Awareness Training
AT&T Safety Procedures on Premises for Construction
Fujitsu Installation Level 3
Qwest 77350 TEIG
Fire-stopping Certified
Ericsson Level 3 Certification
EDUCATION
1989DIPLOMA, ALAMON TELEPHONE
TRAINING CENTER,
Columbia Falls, MT
REFERENCES
Ron Manzano, Construction Manager III; Ericsson, (951) 551-2953
and (951) 200-9503
J.D. Roberts, Implementation Manager; Ericsson, (951) 324-3133
Kenny Townsend, Project
Manager; T-Mobile, (218) 831-1782
Passport available for overseas work
BILL TOWNSEND
PAGE 2
PROFESSIONAL EXPERIENCE
2014-2014SPRINT LTE, Memphis
(Tennessee)
Construction Manager III
BOM and Scoping.
Oversaw installation.
Quality.
2013-2013CELLULAR ONE 4G-LTE, Show low (Arizona)
Construction Manager III
Wrote NTP
Site surveys.
Oversaw Installation.
Quality.
2012-2013LTE PROJECT, Irvine
(California)
Construction Manager III
Ericsson/T-Mobile (LTE)
Acquired permits.
Communicate with landlords and access issues.
Site surveys.
Scoping, BOMing.
Oversaw installation.
Quality.
Close outs.
2007-2012ERICSSON /
T-MOBILE CAM, LA North (California)
Construction Manager III
T-Mobile Project (3G and 4G Upgrade): Responsible for bid walks,
BOM equipment, delivering equipment, change orders, placing and integration.
Site handler, close-outs, quality control.
2005-2007AMATEL / ERICSSON, Southern California
Lead Supervisor
Cingular Project: Lead over warehouse. Responsible for 30
workers. Pre testing and configuring cell sites before
installation. 2106, 2206, HCHC indoor and outdoor. Removal of
Nokia equipment.
2003-2005P.K. DIVERSIFIED
/ ERICSSON, Seattle, WA
Senior Installer
Installed Edge and E-911 cell sites.
2002-2003EXI PARSONS, San
Francisco, CA
Senior Installer
LMU/installation – cell sites – Cingular wireless.
Site surveys – GPS readings, pictures, etc. Cell sites.
2001-2002T-STAFF, Denver,
CO
Senior Installer
Lead installer/equipment removal for ADC.
2000-2001TEKMARK, San
Diego, CA
Senior Installer
Installed MCN 7000.
BILL TOWNSEND
PAGE 3
PROFESSIONAL EXPERIENCE CONTINUED
1998-2000AEROTEK / TEK
SYSTEMS, Midvale, UT
Senior Installer
Oversaw various installation
projects for Fujitsu in Utah, Idaho and Washington for U.S. West.
Maintained scheduled release dates ensuring that all installation procedures
were carried out to a high quality. Prepared detailed records of all interdepartmental
communications for each specific project. Performed site surveys
engineering transmission installation for U.S. West.
1997-1998AEROTEK, Beaverton,
OR
Level 4 Installer
Installation and turn up of ATM and
power plants. Selected because of continuous display of expertise in
handling projects ensuring precise installation procedures.
1996-1997CNG COMMUNICATIONS,
Tucson, AZ
Level 3 Installer
Oversaw a highly competent staff
of fourteen installers under contract to INTEL Communications Group, in the
installation of transmission equipment, OC3, OC12, OC48.
Reviewed specifications and rendered corrections to schematics due to
re-engineering according to customers demands, drafted as-built, assigned
work ensuring all deadlines were met, provided daily and weekly reports for
management, projecting timelines for specific phases and overall project
completion.
1991-1996LAN COMMUNICATIONS,
London, OH
Lead Installer
Rendered advice and direction on
accurate installation procedures of Reliance power, Ericsson Axe Switch and
was assigned to lead wiring in an accurate and timely manner.
1990-1991IDACOM COMMUNICATIONS
INC., Colorado Springs,
CO
Installation Technician
November 1967- November 1970
United States Army
Rank SP/4
Honorable Discharge